Thursday, January 31, 2008

On our way to Side Lift !!!


  • West alliance with 8 anchors on the bottom, preparing for Side Life.
  • Patrick stopped winching and stand off 200 feets east of the E8 Platform due to electrical problem.
  • Electrician troubleshoot Anchor Winch 7 & 8 from 30th/1830hrs.
  • Lewek Snipe standby on location.
  • Wind NE x 7 - 10 knots, Swell height 1.0m, Rolling : 1.0 degress occasionally, Heave : 0.5m.