Tuesday, January 8, 2008

RM 114.00 in the pocket, Thank You Very Much !


Top Picture : E-8 RCD
Bottom Picture : MV Zircon
  • Operations: Continue to nipple up 13 5/8" BOP and RCD, Connection test BOPs, leaking at speed lock "bummer", Lift BOP change ring gasket, Connection test BOP Bagus.
  • Test RCD to 1000psi Bagus, Perform accumulator test, Slip&Cut Drilling line,Electrical,Mechanical inspection on Topdrive,change out washpipe.Install wear bushing.
  • Highlight of the day: Crews made RM$ 114 incentive bonus 16" Hole section. okla!!!.
  • MV Zircon along side for delivery of Base oil and Barite for 12 1/4" Hole section.
  • Plan ahead: Make up 12 1/4" Geopilot, RIH, Drill shoe track Displace to SOBM,Drill 12 1/4" Hole.