New Personal Basket installed




  • CHECK TIGHT 13 5/8" BOP STACK CONNECTION.
  • SCOMI CONTINUE RIGGING UP AUGERS.
  • RIG DOWN BAKER ATLAS RISERS ON WELL #101.
  • SKIG RIG IN POSITION TO LIFT MAST & TIGHTEN UP TIE DOWN CLAMP ON MASTER SKID.
  • M/U TEST JOINTS, PRESSURE UP 13 5/8" BOP IN STAGES 1000PSI TO 5000PSI AGAINST HYDRIL & CHECK TIGHT CONNECTION.
  • CONTINUE WAIT ON WEATHER.
  • PRESSURE UP BOP STACK TO 4K AND RE-TIGHT CONNECTION / HUBS.
  • CONTINUE INSTALL HANDRAIL GRATINGS ON MASTER SKID ON THE PLATFORM.
  • GENERAL MAINTENANCE, PAINTING, CHIPPING & HOUSEKEEPING.
  • Present weather Force 5, heel : 2.0 degrees