Showing posts with label Drilling Operation. Show all posts
Showing posts with label Drilling Operation. Show all posts

Tuesday, January 6, 2009

Stabmaster Operator & Jam Techn. - Sembilan & Alister

Alister & Sembilan - Jam Techn.& Stabmaster Operator on the rigfloor.

Running Casing using Weatherfords CWDT.

Friday, January 2, 2009

Installing Stop Collars on the Casing

Deck Crews installing stop collars on the casing

Wednesday, December 24, 2008

Show Timeeeeeeeeeee..........

Chendai,Franco & Johnny connection time on the rig floor

Jerome Wan ( Asst.Driller ) "Merry Christmas"


Sunday, December 21, 2008

Another Succefull Cement Job Completed

Farentino & James ( BJS Cementer ) with Peter Newman ( HL.Crane ) Thump Up!

Wednesday, December 17, 2008

Runggai - Asst.Driller measuring BHA

Runggai ( Asst.Driller ) measuring BHA on the rig floor.

Keding,Daniel & Terrence leading the way in Safety

Tuesday, November 4, 2008

Hanger Assembly

Transfering the Hanger Assembly from the Tender to the rig floor

Thursday, October 23, 2008

Installing RCD

Happy crew is safe crew


Lanny ready for the job


Bit Lian monitor the landing RCD




Monday, September 22, 2008

Saturday, September 20, 2008

VFD Project





Doublin & Henry Welder

Tuesday, September 16, 2008

Acid job equipment arrive.



VFD Plugs Box


Henry welder in action.


Running 7" liner





VFD Project

Job was completed in safe manner.

Proper procedure by team welders.

Prepare for installation

Seaman make sure all are tidy during VFD cable mounting clamps installation.







Monday, September 8, 2008

Thread Cleaning


Roustabout clean liner thread.


Sunday, September 7, 2008

VFD Project


Forseas crew & WA work together.


Friday, September 5, 2008

VFD Project


Doublin welder tack weld spike rod to wall for insulation.


Frankie welder weld bulk head wall plate.




Thursday, September 4, 2008

Rig Improvement


Slip handle protector plate.


Shale shaker cement catcher.




Wednesday, September 3, 2008

Make up pipe.


Franco Roughneck


Rig Improvement

Riser storage saddle.

BOP Splash guard.


BOP Crane Hydraulic line pipe.






Expro Burner Boom Installation.