Monday, January 12, 2009
Saturday, February 23, 2008
The Forecast remains on track
An area of low pressure should drift southwestward out of the area. This is expected to allow for the weak NE monsoon to return through the week. Light to gentle NE'erly winds are forecast from Sunday onwards. Seas are expected to gradually decrease through Monday, but build slightly thereafter.
West Alliance continue wait on weather due to 1.5 degrees heeling.
Friday, February 22, 2008
W.O.W.
Thursday, February 21, 2008
Pre Tour Safety Meeting
Wednesday, February 20, 2008
Crew Change on board
From Left : Aling Nimbun(Crane Operator), Philip Sikun (Roustabout), Dave Tough (Tourpusher), Mancha (Assistant Driller) and Josetephenson (Roustabout)
- CONTINUE WAIT ON WEATHER.
- GENERAL MAINTENANCE, PAINTING, CHIPPING & HOUSEKEEPING.
- MECHANICAL AND ELECTRICAL PMS.
- CONTINUE INSTALL HANDRAIL GRATINGS ON MASTER SKID ON THE PLATFORM F13E.
Tuesday, February 19, 2008
New Personal Basket installed
- CHECK TIGHT 13 5/8" BOP STACK CONNECTION.
- SCOMI CONTINUE RIGGING UP AUGERS.
- RIG DOWN BAKER ATLAS RISERS ON WELL #101.
- SKIG RIG IN POSITION TO LIFT MAST & TIGHTEN UP TIE DOWN CLAMP ON MASTER SKID.
- M/U TEST JOINTS, PRESSURE UP 13 5/8" BOP IN STAGES 1000PSI TO 5000PSI AGAINST HYDRIL & CHECK TIGHT CONNECTION.
- CONTINUE WAIT ON WEATHER.
- PRESSURE UP BOP STACK TO 4K AND RE-TIGHT CONNECTION / HUBS.
- CONTINUE INSTALL HANDRAIL GRATINGS ON MASTER SKID ON THE PLATFORM.
- GENERAL MAINTENANCE, PAINTING, CHIPPING & HOUSEKEEPING.
- Present weather Force 5, heel : 2.0 degrees
Monday, February 18, 2008
Continue Wait on Weather
Sunday, February 17, 2008
Saturday, February 16, 2008
New Boss on the Blog !!!
Heavy Weather, Force 7!!!
Friday, February 15, 2008
Thursday, February 14, 2008
Rough Weather
- Prepare BOP for change out.
- Rig up SCOMI equipments and install grating on rig floor handrails.
- Continue wait on weather.
- Moderate winds are expected to persist through the weekend. The winds should begin to decrease early next week as a trough moves westward off the northen coast of borneo. A monsoon surge to the north is expected to produce an increase of the swells during the next three days.
- Present wind : NxE x 19knots,Draft 9.50m, swell 2.0m, Heel 2. degrees and Pitch 1.2 degrees.
Wednesday, February 13, 2008
Tuesday, February 12, 2008
Regular Personal Transfer
Monday, February 11, 2008
Activities on board while Waiting on Weather
Wilkens Weather Technologies forecast :The Northeast Monsoon will continue to produce fresh northeasterly winds for the next few days. A weak area of Low Pressure will move offshore Borneo and reduce winds late in the week. Showers and Thunderstorms are expected to increase through mid-week.Significant seas near or above 2.5m are expected during the next few days.
- WAIT ON WEATHER.
- CONTINUE GENERAL HOUSEKEEPING, CHIPPING, PAINTING & MAINTENANCE.
- SPOT BAKER ATLAS UNIT ON RIG FLOOR.
- ASSIST SCOMI SPOT & RIG UP THEIR EQUIPMENT.
- ELECTRICIAN & MECHANIC PMS.
Sunday, February 10, 2008
W.O.W.
Saturday, February 9, 2008
Still Waiting on Weather......
- Lewek Snipe unable to hold to position due to change of current direction.
- Bourbon requested to tie on the Supply Boat Mooring Buoy while waiting for West Alliance to Rig up the Last Lift MAST SET.
- Tender continue to wait on weather, Wind gusting NE x 17 knots, SWell : ENE/1.5m/8secs and Heeling increase to 1.5 degrees.
- Gong Xi Fa Cai!!!
Friday, February 8, 2008
Wait on Weather
- 0345 Commence pulling tender away from platform for anchor handling to side lifting position.
- 0410 Stopped pulling tender away from platform - wait on Bourbon Alexandre.
- 0557 Anchor buoy no.8 on Bourbon Alexandre deck.
- 0610 Anchor no.8 off bottom.
- 0612 Anchor no.8 on stern roller - commence heaving no.8 anchor wire.
- 0642 Stopped heaving no.8 anchor wire - electrical problem on winch - Electrician troubleshoot.
- 0758 Commence heaving on no.8 anchor wire.
- 0815 Anchor no.8 racked.
- 0820 Pennant wire no.8 off Bourbon Alexandre & secured to Port crane - commence winching tender to stbd side.
- 0854 Pennant wire no.8 transferred to Bourbon Alexandre.
- 0856 Slack-off no.8 anchor wire.
- 0858 Anchor no.8 on stern roller - commence paying out no.8 anchor wire.
- 0935 Stopped paying out no.8 anchor wire.
- 0937 Anchor no.8 on the bottom.
- 0944 Anchor buoy no.8 in the water.
- 0957 Anchor buoy no.7 on Bourbon Alexandre deck.
- 1008 Anchor no.7 off the bottom.
- 1012 Anchor no.7 on stern roller - commence heaving no.7 anchor wire.
- 1123 Anchor no.7 racked.
- 1128 Pennant wire no.7 secured to Port crane - commence winching tender forward.
- 1150 Stopped moving tender forward.
- 1154 Pennant wire no.7 transferred to Bourbon Alexandre.
- 1156 Slack off No.7 Anchor Wire.
- 1202 Anchor No.7 on the Stern Roller.
- 1234 Stopped paying out Anchor wire No.7.
- 1235 Anchor No.7 on the bottom.
- 1240 Anchor Buoy No.7 in the water.
- 1242 Commence approaching F13E Platform.
- 1350 Attained side lifting position.
- 1500 Wait on Weather, Wind : NE 17 - 21knots, Swell : NE 1.5m
Wednesday, February 6, 2008